ALU-CAB CANOPY CAMPER BULKHEAD PANEL FOR TACOMA
SKU: 1799 GGThe Alu-Cab Bulkhead Panel is an option for Alu-Cab Canopy Campers that have Goose Gear storage modules on both sides of the camper. This product requires the front Utility Modules for proper fitment and securing as it is bolted to the Utility modules using the supplies L Brackets.
This L Bracket installation method means you can slide the panel forward and rearward as you so choose. For example, you simply want a clean fill panel at the front of your Canopy camper that is in close to alignment with the optional AluCab water tank. This panel can do just that. Or, lets say, you want to place a second battery or just personal gear and you need more space, the panel can be slid towards the rear of the vehicle to create a larger storage space.
The Bulkhead Panel includes the panel, hatch door and hardware to secure it to the Utility modules on both sides of the truck. It does not include the floor plate or any modules.
ALL GOOSE GEAR PRODUCTS ARE MADE TO ORDER AND HAVE AN 8-12 WEEK LEAD TIME.
The Alu-Cab Bulkhead Panel is an option for Alu-Cab Canopy Campers that have Goose Gear storage modules on both sides of the camper. This product requires the front Utility Modules for proper fitment and securing as it is bolted to the Utility modules using the supplies L Brackets.
This L Bracket installation method means you can slide the panel forward and rearward as you so choose. For example, you simply want a clean fill panel at the front of your Canopy camper that is in close to alignment with the optional AluCab water tank. This panel can do just that. Or, lets say, you want to place a second battery or just personal gear and you need more space, the panel can be slid towards the rear of the vehicle to create a larger storage space.
The Bulkhead Panel includes the panel, hatch door and hardware to secure it to the Utility modules on both sides of the truck. It does not include the floor plate or any modules.
ALL GOOSE GEAR PRODUCTS ARE MADE TO ORDER AND HAVE AN 8-12 WEEK LEAD TIME.